Writing of the inspection and maintenance guide
Built between Rades and La Goulette, on the shore of Tunis Lake to accommodate the first exchanger “all directions”, extending the connection to the North Fair Kram, the bridge Rades – La Goulette, inaugurated on 21 March 2009 is one of the line of a shaft comprising a complex of structures and roads with a range of 14 km and a half. This complex links both North and South shores of “Lake” in Tunis. It spans the channel and the fast track and the TGM line from Tunis to La Goulette.
Client
Ministry of Equipment, Housing and Territory Planning
The General Directorate of Highways
Project Manager
Group of consulting Tunisian-Japanese companies :
NIPPON KOEI, PCI, SCET and STUDI
Principal features
The builder TAISEI has used the expertise of DIADES to develop specific guidance for maintenance, monitoring and maintenance of this exceptional structure.
- Prestressed concrete box girder Extra dosed
- Length: 260m
- Bays: 3 (1x120m and 2x70m)
DIADES’ task
DIADES completed the inspection and maintenance guide of the structure, and the definitions of terms and content:
- the operation of the structure
- monitoring the structure
- management of the structure